At this stage, information is obtained from the Customer, including:
- Type, rating, overall dimensions, and weight of the transformer for transportation;
- Location of dispatch and destination point;
- Delivery schedule.
Rigging and Transportation of Transformers
1. Definition of Technical Specification
2. Analysis of the Technical Specification and Development of the Transportation Scheme
At this stage, we:
- Examine existing transport infrastructure and access roads at the loading and unloading sites; select the optimal route and method(s) of transportation (railway or specialized transport);
- Determine the rigging method for the transformer during loading and unloading onto the transport platform;
- Develop procedures for rigging operations: typically, large oil-filled transformers undergo partial disassembly, oil draining into separate containers, and tank sealing prior to rigging;
- Identify additional requirements for transport vehicles, oil-draining containers, packaging for high-voltage bushings, and other necessary equipment;
- Establish the schedule for transportation works, taking into account the specific technical and operational requirements.
3. Preparation of Transportation Cost Estimate
Develop a detailed cost estimate for the transformer transportation and submit it for the Customer’s review and approval.
4. Execution of Service Agreement
Conclude a formal contract with the Customer outlining the scope of work, responsibilities, schedule, and terms and conditions for the transportation services.
5. Execution of Transportation Works
Perform all transportation-related activities in accordance with the terms of the contract, ensuring compliance with safety regulations, technical specifications, and agreed schedules.
The advantage of «SMART ENERGY SERVICE» LLC lies in the company’s specialization in major overhauls of power transformers, which enables us to provide a complete range of services, including:
- Full or partial disassembly of the transformer;
- Rigging operations of any complexity (the company is equipped with modern, high-capacity hydraulic pushing and lifting systems);
- Turnkey transformer installation after transportation, including electrical testing, commissioning, and connection to the power grid.